Water resourcing built around the AMP cycle.
Design, MEICA and delivery people for clean water, wastewater and network schemes — resourced against the framework peaks and troughs that the five-year AMP cycle creates.
Market context
What’s driving demand in Water
The water sector resources in five-year waves. AMP8 has brought a step change in investment, with storm overflow reduction, nutrient removal, resilience and mains renewal all pushing volume through delivery frameworks that were already busy — and every water company is competing for the same MEICA and process engineering population.
The cycle itself is the resourcing problem. Work slows at the end of an AMP as budgets close out, then surges at the start of the next one, so framework partners face a persistent choice between carrying capability through the trough or trying to rebuild it in a crowded market at exactly the moment everyone else is hiring.
Regulatory pressure has sharpened this further. Environment Agency permitting, Ofwat performance commitments and public scrutiny of spill data mean schemes carry deadlines with financial consequences attached, which makes late resourcing an expensive way to save money.
- 5 years
- Length of an AMP period — the investment cycle that dictates hiring peaks and troughs across the sector
- AMP8
- The current asset management period, covering the 2025–2030 investment programme
- Blue card
- EUSR National Water Hygiene certification, required before anyone can work near the potable supply
Sector context only — publicly stated policy targets, regulatory regimes and industry cycles. These are not NE Project Solutions performance figures.
Disciplines
Roles we typically place
A representative sample rather than a limit — if the discipline sits inside a water scope, we can usually resource it.
- MEICA Engineer
- Process Engineer (wastewater)
- Design Manager (AMP frameworks)
- Commissioning Technician
- Site Manager (clean water)
- Network Modeller
- Project Engineer (capital delivery)
- Quantity Surveyor (water frameworks)
Tickets & compliance
What has to be in place before day one
We verify certification, clearance and right-to-work status before a candidate reaches your shortlist — and track expiry dates so a lapsed ticket never stops a shift.
EUSR National Water Hygiene
The blue card — mandatory for anyone working on or near the potable water supply.
SHEA Water
Safety, health and environmental awareness passport for water industry sites.
Confined space entry
City & Guilds 6150 medium and high risk for chamber, wet well and tank entry.
NRSWA cards
Streetworks operative and supervisor units for mains and network works in the highway.
CSCS / CPCS
Construction and plant cards for site access, excavation and lifting operations.
LOLER & PUWER
Statutory inspection regimes covering lifting equipment and plant on treatment sites.
How we help
Three ways we support Water programmes
Workforce Solutions
MEICA, process and delivery staff with water hygiene, confined space and streetworks tickets verified before the first site visit.
Workforce Solutions for WaterManaged Project Services
Managed teams for defined AMP packages — commissioning, refurbishment, survey campaigns — flexing with the framework's actual release schedule.
Managed Project Services for WaterConsultancy Services
AMP-horizon workforce planning that models the trough as carefully as the peak, so capability isn't lost and then rebought at a premium.
Consultancy Services for WaterOther sectors we work in
The same disciplines and tickets travel further than people expect — many of our contractors move between these markets.